Two images from two different projects near São Luis, from 2021 and 2022:

Above: Ridge pond that collects rain runoffs from a structural road, being built in November 2021 (left photo) , and now in March 2022 (right photo), with the few rain that we got here in the south. Next steps include restoring the margins.


Below: Saddle pond (between two higher hills) that collects rain runoffs and is integrated with deep swales that spread the water on the landscape. Was built in the end of 2020, filled with rain in April 2021 (photo on the left), and now in March 2022 (photo on the right),



For inspiration, watch this videos: